How to Apply for Basic Housing Unit (BHU) Recognition in Hong Kong: 5 Steps from Hiring a Specified Professional to Form BHU-01 (2026)
By HOLLING BHU One-Stop Certification | Last updated: 19 November 2026
Quick answer: how do you apply for BHU recognition?
- Confirm the unit is eligible: the subdivided unit (SDU) is in a private residential building (or the residential part of a composite building), and the applicant is the owner or has the owners’ written consent.
- Appoint a specified professional: a registered architect, a registered professional engineer in a specified discipline, or a registered professional surveyor (building surveying).
- Site inspection and certification: the report must be issued within 14 calendar days of the last inspection.
- Submit within 28 calendar days of the report’s issue date, with Form BHU-01 and supporting documents.
- Pay, wait for approval, receive recognition: recognition is valid for 5 years; apply for renewal 3 to 6 months before expiry.
The details below are based on the government’s BHU website and the Application Guide for Registration and Recognition.
What should you check before applying?
- Who can apply: the sole owner of the flat in which the SDU is located, or a person with the written consent of all owners. Co-owners must attach the written consent of the other owners; a sample consent form is available on the government website.
- Is the unit regulated? Use the scope checker on the BHU website. Public rental housing, hostels and bedspace apartments are not covered.
- Does the unit meet the eight minimum standards? Floor area, headroom, fire safety, structural safety, separate toilet, water supply, lighting and ventilation, and separate water and electricity meters. If not, alteration works come first. See The Eight Minimum Standards Explained.
- Any outstanding government orders? Any statutory orders, notices or directions issued by the Buildings Department or other departments for the SDU or the flat must have been complied with. See the eligibility section of the government’s BHU Recognition page.
Tip: owners of pre-existing SDUs should complete the free registration on or before 28 February 2027 to secure the grace period. See What SDU Owners Must Do Before 1 March 2027.
Who can certify a Basic Housing Unit?
The certification report must be prepared by a “specified professional” following the government’s Code of Practice and the prescribed report form:
- Registered architect;
- Registered professional engineer (building, building services, civil, fire or structural discipline);
- Registered professional surveyor (building surveying division).
The applicant appoints the professional. We recommend a site assessment first so that every non-compliant item is listed before works begin, rather than discovering failures at certification.
The 5 steps and time limits
| Step | What to do | Time limit / note |
|---|---|---|
| 1 | Confirm eligibility and that the unit is regulated | Owner or person with written consent |
| 2 | Appoint a specified professional; complete alteration works if needed | Final inspection after works are done |
| 3 | Site inspection and certification report | Within 14 calendar days of the last inspection |
| 4 | Submit Form BHU-01 with documents | Within 28 calendar days of the report’s issue date |
| 5 | Pay after receiving the demand note; await approval | Pay by the stated deadline |
Processing time depends on the complexity of the case and whether it is selected for audit. A result notice is issued once all documents are received and processing is complete.
What documents do you need?
- Form BHU-01, completed and signed on or after 1 March 2026;
- Copy of the applicant’s identity document (business registration certificate for companies); not needed if the original is shown in person;
- Proof of ownership: latest land register or title record;
- The certification report signed by the specified professional;
- Written consent of all owners (if the applicant is not the sole owner);
- Instrument of authorisation (if the applicant is a company).
Note: incomplete applications may be returned, and fees paid are not refundable, so check every item before submitting.
How can you submit the application?
- Online: users registered with iAM Smart+ can complete, sign and submit the e-form (see public forms) and pay instantly by FPS.
- By post: Tsim Sha Tsui Post Office PO Box 90888, Dedicated Team on Subdivided Units.
- Drop-in box: Dedicated Team office, 30/F, Revenue Tower, 5 Gloucester Road, Wan Chai (Monday to Friday, 9 am to 6 pm, except public holidays).
How much are the government fees?
- Recognition application fee: HK$3,000 per SDU;
- Renewal fee: HK$2,400 per BHU;
- Early-bird concessions: during the first three years (1 March 2026 to 28 February 2029) the fee may be waived or halved depending on when the unit was registered and when the application is submitted. See our registration deadline guide.
These are government fees only and exclude the specified professional’s fee and alteration works. For works costs, see Basic Housing Unit Renovation Cost.
What happens after recognition is granted?
- The address, validity period and location map are published on the government’s list of recognised BHUs on the BHU website.
- Changes to owner or operator details must be reported with Form BHU-02 within 15 calendar days.
- Changes that may affect compliance (e.g. partition walls, fire doors, toilet or water point locations) must also be reported within 15 calendar days; some require a new certification report.
- Recognition lasts 5 years; renew with Form BHU-01A 3 to 6 months before expiry.
What most often delays a BHU recognition application?
- Expired report: submitting more than 28 calendar days after the report was issued.
- Missing documents: such as proof of ownership or co-owners’ consent.
- Serious safety problems in the building’s common parts: e.g. structural cracks or unauthorised works blocking escape routes, even if the unit itself complies.
- Clearly inadequate design or layout: an application may still be refused if the unit does not provide a safe, hygienic and reasonable living environment overall.
For the legal grounds for refusal, appeals and a pre-application checklist, see Can a BHU Recognition Application Be Refused?
Frequently asked questions
How do I apply for BHU recognition?
Appoint a specified professional to inspect the unit and issue a certification report, then submit Form BHU-01 with proof of ownership, identity documents and the report within 28 calendar days of the report’s issue date, online, by post or via the drop-in box.
Who can certify a Basic Housing Unit?
A registered architect, a registered professional engineer (building, building services, civil, fire or structural discipline), or a registered professional surveyor (building surveying division).
How much does BHU recognition cost?
The government application fee is HK$3,000 per SDU and renewal is HK$2,400, with waivers or half-fee concessions in the first three years depending on registration and application dates. Professional and works costs are extra.
How long is BHU recognition valid?
Five years. Apply for renewal with Form BHU-01A 3 to 6 months before expiry; a successful renewal is valid for another five years.
Are fees refunded if an application is returned?
According to the government’s application guide, incomplete applications may be returned and fees paid are not refundable, so check all documents before submitting.
Sources
- BHU website: Recognition
- Application Guide for Registration and Recognition (Chinese)
- BHU website: Application guide and forms
Further reading
- Can a BHU Recognition Application Be Refused?
- The Eight Minimum Standards for Basic Housing Units
- What SDU Owners Must Do Before 1 March 2027
- Basic Housing Unit Renovation Cost
- Our BHU services
Want assessment, alteration works and the recognition application handled in one place? Send us the address, size and number of units on WhatsApp 6934 8391. HOLLING Design & Engineering Co., Limited is a registered minor works contractor (MWC 227/2023). Office: C2, 7/F, Por Mee Factory Building, 500 Castle Peak Road, Cheung Sha Wan, Kowloon (near Lai Chi Kok MTR Station), open daily 10:00–22:00.
This page is for general reference only and does not constitute legal or professional advice. Procedures, time limits and fees are subject to the Basic Housing Units Ordinance and the latest government announcements.