Converting SDUs to BHUs: Do You Need Owners’ Corporation Consent? DMC, Common Parts and Meters

By Holling One-Stop BHU Certification | Last updated: 23 November 2026

Short answer

Common conversion works: do you need to ask the OC?

WorksGeneral positionNotes
Partitions, kitchen, toilet, doors, windows and flooring inside the flatGenerally within the flat; OC not involvedMust still comply with the Buildings Ordinance and the DMC; some DMCs impose extra restrictions on alterations
Separate water and electricity meters inside the flatGenerally does not involve the DMC; no OC consent neededGovernment FAQ question 41
Meters in the building’s meter room or other common areasMay need OC consent under the DMCDeal with it before works start
Connecting to communal electricity mains or increasing power demandMay need OC consent under the DMCAsk the power company and the management company first
Pipes or fixtures on external wallsMay involve common partsUnless the DMC provides otherwise, common parts under the Building Management Ordinance include external walls and roofs
A flat divided by deed into separately owned units, applying for one unitWritten consent of the owners of all divided units requiredGovernment FAQ questions 19 and 31
Application by an operator (sub-landlord)Owner’s written consent requiredApplies to both registration and recognition

Summarised from the Government’s BHU FAQ. For a specific building, its DMC prevails.

Chart: works inside the flat generally do not involve the owners corporation; meter rooms, communal mains, extra power demand and external walls may need OC consent under the DMC
Works inside the flat vs works involving common parts (source: Basic Housing Units website FAQ)

Why check the DMC?

The DMC is the contract between the owners of a building. It sets out which areas are common parts and how owners may use and alter their flats. Question 40 of the Government’s BHU FAQ states that grace-period registration or BHU recognition does not negate legal obligations under the DMC or government lease; applicants remain responsible for compliance and may seek professional advice.

In other words, BHU recognition only shows that a unit meets the minimum standards of living conditions. If conversion works breach the DMC, other owners or the OC can still take action under the DMC.

Separate meters: when is OC consent needed?

Separate water and electricity meters are one of the eight minimum standards. According to question 41 of the Government’s FAQ:

For meter technical requirements and the application process, see How to Apply for Separate Water and Electricity Meters for BHUs.

Preparation before conversion

  1. Confirm who is applying: the owner, or an operator with the owner’s written consent; for a flat divided by deed, the written consent of the owners of all divided units.
  2. Read the DMC: check what counts as common parts, any restrictions on alterations, and whether prior notice or consent is required. The DMC can be obtained from the management company or searched at the Land Registry.
  3. List works affecting common parts: for example the meter room, mains, external-wall pipes or extra power demand.
  4. Get written consent before works: submit the scope of works to the OC or management company and start only after receiving a written reply.
  5. Deal with statutory orders and convert to standard: see Building Department Orders and BHU Recognition and The Eight BHU Minimum Standards.

For the difference between registration and recognition and the early-bird fees, see Grace-Period Registration vs BHU Recognition.

Conversions from 1 August 2026: slip-resistant floors

Question 39 of the Government’s FAQ notes that the elderly-friendly requirements under regulation 73 of the Building (Planning) Regulations took effect on 1 August 2026. If a flat is converted into SDUs on or after that date and the works require building plan submission or fall under the Minor Works Control System, bathrooms, kitchens and toilets must have slip-resistant floors — for example when adding a new toilet or replacing all drainage pipes within a toilet. Simply replacing sanitary fittings or re-tiling does not trigger the requirement.

FAQ

Does a BHU recognition application need the OC’s signature?

No. The applicant must be the owner, or a person with the owner’s written consent; the Ordinance does not require the OC to sign. However, if conversion works involve common parts, OC consent may be needed under the DMC.

Do I need OC consent to install a separate electricity meter inside the flat?

According to the Government’s FAQ, installing sub-meters inside the flat generally does not involve the DMC and does not need OC consent; works involving the meter room, communal mains or increased power demand may need it.

Does BHU recognition mean the conversion complies with the DMC?

No. The Government states that registration or recognition does not negate obligations under the DMC or government lease.

What if the building has no OC?

Follow the DMC. In general, ask the DMC manager or the property management company first; works involving common parts should likewise have a written reply before they start.

Further reading: Do BHU Conversions Need Plan Approval? The Minor Works Control System Explained

Sources

This article is general information only and is not legal advice. Each building is subject to its own DMC; seek legal advice where necessary.