What Is a Basic Housing Unit (BHU)? How Is It Different from a Subdivided Unit?

By Holling One-Stop BHU Certification | Last updated: 23 November 2026

Short answer: what is a BHU?

A Basic Housing Unit (BHU) is a domestic subdivided unit that meets the minimum standards of living conditions under the Basic Housing Units Ordinance (Cap. 658) and holds BHU recognition. To be lawfully let for residential use, a subdivided unit (commonly called a “劏房”) must be converted to the standards and recognised, or hold valid grace-period registration during the grace period.

How does the law define a “subdivided unit”?

Under the Government’s Code of Practice on the Minimum Standards of Living Conditions for Basic Housing Units, a subdivided unit is a flat in a domestic building (or the domestic part of a composite building) that has been partitioned in a way that differs from the reference building plan, forming two or more enclosed compartments, at least two of which are designed to be let under separate domestic tenancies. The whole flat containing the SDUs is called the host flat.

In other words, if two or more rooms in a flat are each let separately for residential use, the flat is generally within the regime. You can use the Government’s scope checker for a preliminary check.

BHU vs ordinary subdivided unit

ItemOrdinary SDUBHU
Legal statusFrom 1 March 2027, letting without valid registration or recognition is an offenceValid recognition; may be lawfully let for residential use
SizeNo uniform minimumInternal floor area at least 8 m²
HeadroomNo uniform minimumAt least 2.3 m floor to ceiling; at least 2 m to the underside of beams
Fire safetyPartition materials, doors and corridor widths varyTo Buildings Ordinance standards; a separate fire detector in each SDU; corridors at least 0.75 m or 1.05 m wide (depending on the existing fire door)
ToiletSometimes shared or on a balconyA separate, enclosed and waterproofed toilet in each unit
Water supply and sinkNot always providedA water supply point and sink outside the toilet
Lighting and ventilationSome rooms have no windowOpenable window + artificial lighting + mechanical ventilation (5 air changes per hour)
Water and electricity metersOften shared by the landlordSeparate water and electricity meters from the Water Supplies Department and power company
CertificationNoneSite inspection and a signed certification report by a specified professional
Before and after converting a subdivided unit into a BHU: an old rental room becomes a bedroom with wardrobe, LED strip lighting and its own power points
A Holling SDU-to-BHU conversion: the same room before (top) and after (bottom).

These eight areas are the Government’s eight minimum standards for BHUs; the detailed requirements are set out in the Code of Practice.

What is outside the BHU regime?

The Government lists the following as outside the Basic Housing Units Ordinance:

These premises are regulated by other laws and cannot be “legalised” through BHU recognition. For more situations, see Which Flats Are Not Regulated by the Basic Housing Units Ordinance?

When must SDUs become BHUs?

DateWhat happens
1 March 2026The Ordinance takes effect (except the unlawful-letting offence); grace-period registration and BHU recognition open
28 February 2027Grace-period registration closes (free, Form REG-01)
1 March 2027The unlawful-letting offence takes effect; enforcement begins against SDUs without valid registration or recognition
1 September 2029Countdown period begins: no new tenancy for units without recognition
28 February 2030Grace period ends; units not converted and recognised will face enforcement

For registration eligibility and documents, see BHU Registration Deadline; for how registration and recognition differ, see Grace-Period Registration vs BHU Recognition.

What are the usual steps to convert an SDU into a BHU?

  1. Assessment: check each SDU against the eight standards and list the items that fall short.
  2. Conversion works: for example replacing partitions or doors, adding a separate toilet, installing mechanical ventilation, and applying for separate water and electricity meters. Minor works follow the Buildings Department’s Minor Works Control System.
  3. Certification: a specified professional inspects the site and issues a certification report within 14 calendar days after the last inspection.
  4. Recognition application: submit Form BHU-01 within 28 calendar days of the report date. The application fee is $3,000 per SDU, with early-bird reductions or waivers.

For detailed steps, see How to Apply for BHU Recognition: 5 Steps, Documents and Timeline. For one-stop handling from assessment and conversion to application, see Holling’s BHU certification service; real conversion examples are in our portfolio.

FAQ

Are BHUs government-provided housing?

No. BHUs are subdivided units let by private owners and recognised by the Government as meeting the standards. The Government’s “Light Public Housing” is a separate public housing programme.

Does grace-period registration mean the unit has BHU recognition?

No. Registration only allows a registered flat to keep being let until 28 February 2030; conversion and recognition must be completed in that period.

How long is BHU recognition valid?

Five years. Renewal must be applied for on Form BHU-01A within six to three months before expiry, with fresh certification by a specified professional. The renewal fee is $2,400 per SDU.

Can a room without a window become a BHU?

Under the Code of Practice, a habitable space must have at least one openable window facing the outdoors (glazed area not less than 0.1 m²), plus artificial lighting and mechanical ventilation. A windowless room generally needs the layout to be changed so that every habitable space has a window.