Grace-period registration for subdivided units closes on 28 February 2027 — free to register | WhatsApp 6934 8391

Basic Housing Unit Renovation Cost: Why Quotes Come In Higher Than the Government’s HK$50,000+ Estimate

By Holling BHU Certification One-Stop Service | Last updated: 17 November 2026

How much does a Basic Housing Unit (BHU) conversion cost?

In May 2026 the government (Housing Bureau) published two showflats whose conversion cost averages about HK$25,000 to HK$51,000 per subdivided unit. But these are estimates for two basic units whose existing walls already complied. They are not the actual quote for every older unit.

Actual quotes vary with the walls, toilets, waterproofing and the location of the meters. This article goes through the Housing Bureau’s official presentation item by item to show what the government figures include, what they leave out, and why the quotes you receive may be higher.

Source: Housing Bureau showflat presentation (PDF, in Chinese), May 2026.

1-minute video version: a short Cantonese cartoon covering the three assumptions behind the government estimate and four questions to ask before accepting a quote.

Basic Housing Unit renovation cost: the government estimate explained (1-minute video)
Video: Basic Housing Unit renovation cost, government estimate vs real quotes (Cantonese, about 1 minute, Chinese subtitles). Watch on YouTube
Before and after: an old rental unit and the same unit with a kitchenette, air conditioner and TV
Holling BHU Certification One-Stop Service project: unit before and after

Where does the government’s “just over $50,000” come from?

The Housing Bureau used two real older flats as showflats and estimated what it would cost to convert them into BHUs.

Page 2 of the presentation says the estimates assume simple, safe materials with no luxury fit-out, and keep the original layout where possible. So the “just over $50,000” is the average per unit for showflat B, and it assumes the existing walls already comply.

What does the official estimate include?

These are the items listed on p.17 (showflat A) and p.39 (showflat B), in official estimated amounts (HK$):

ItemShowflat AShowflat B
Replace the flat entrance with a fire door (excl. installation)$5,000–6,000$5,000–6,000
Replace subdivided unit doors with smoke-resistant self-closing doors (excl. installation)$10,000–12,000 (2 units)$15,000–18,000 (3 units)
Smoke detectors (incl. installation and FS251)$1,500$2,000
Dry powder fire extinguisher (incl. installation and FS251)$600$600
Louvred toilet doors (excl. installation)$2,000$4,000
Separate water meters (incl. application, inspection, installation)$8,000–14,000$12,000–21,000
Separate electricity meters (incl. application, inspection, WR1, installation)$10,000–14,000$15,000–21,000
Demolish and rebuild partition (enlarge one unit)Not applicable$10,000
New independent toiletNot applicable$40,000
Tap and sink outside the toiletNot applicable$12,000
Toilet exhaust fan and ductNot applicable$9,600
Installation of the items above that exclude it$5,000–10,000$15,000–20,000
Total for the whole flat$42,100–60,100$140,200–164,200

Two things to note: showflat A had no wall work at all, and showflat B’s wall work was only to enlarge a unit. The Housing Bureau does not say what material the new walls used or what their fire rating is.

Showflat B: where the official estimate (lower bound HK$140,200) goes
New toilet, tap and sink outside the toilet, exhaust fan and duct

$61,600

Separate water and electricity meters (incl. application, inspection, WR1)

$27,000

Fire door, smoke-resistant self-closing doors, louvred toilet doors

$24,000

Installation of the doors above

$15,000

Demolish and rebuild partition (to enlarge one unit)

$10,000

Smoke detectors and fire extinguisher

$2,600

This estimate excludes the Specified Professional’s certification fee (from $3,500 per subdivided unit), re-piping or rewiring, and wall replacement. Source: Housing Bureau showflat presentation, p.39 (May 2026). Items grouped by lower-bound amounts; compiled by Holling BHU Certification One-Stop Service.

What does the official estimate not include?

Pages 17 and 39 state several assumptions. A unit that does not meet them will cost more than the official figures:

In short, what the official figures do not list is the extra work needed when a unit is in worse condition than the showflats. This is not concealment; the showflats were simply chosen from units in better condition.

Why might the quotes you receive exceed the official estimate?

What follows is our observation from assessing units, not official figures. Comparing the showflat assumptions with the eight BHU standards, the gaps are mainly here:

ItemOfficial showflat assumptionTypical older unit in practice
Partition wallsExisting walls already non-combustible and smoke-resistant, no work needed (pp.6 and 9)In the units we have assessed, partition walls have almost always needed replacing. Ordinary timber or plasterboard walls look the same from outside; you have to check them against the standard
Fire documents for wallsNot listedThe standard requires fire-resistant, smoke-resistant walls but does not spell out what documents must be shown. In our experience certification goes through only if a fire certificate is available, so walls need certified materials
Water pipesExisting pipes assumed good, no re-pipingSupply and drain pipes often need redoing, and the toilet and the sink outside it need a trap and anti-siphon device
Electrical wiringExisting wiring assumed safe, no rewiringEach unit needs its own meter and distribution board; old wiring and boards often have to be redone
Toilet waterproofingShowflat A had no new toilet; showflat B costed one new toilet at $40,000A new or rebuilt toilet needs its wall and floor waterproofing inspected by the Specified Professional, with a water test
Drawings and documentsNot listedWork on partitions or raised floors falls under the Minor Works Control System and needs drawings, documents and signatures
Headroom and structural loadNot listedA solid raised floor can bring headroom below the minimum; new works must be assessed for structural impact
Schematic floor plan: three subdivided units

Unit 1ToiletSinkBedDetectorUnit 2ToiletSinkBedDetectorUnit 3ToiletSinkBedDetectorShared corridorExtinguisherWater & power metersEntrance (fire door)

Thick blue lines are partition walls (floor to ceiling); red marks fire and fire-safety items; blue marks water, electricity and sink items. Schematic only, not to scale and not a design drawing. Facilities follow the Housing Bureau’s BHU minimum standards. Drawn by Holling BHU Certification One-Stop Service.

Fire doors: official estimate versus our quote

The showflats price the flat entrance door and the subdivided unit doors at $5,000 to $6,000 each excluding installation, with installation charged separately (pp.17 and 39). Our quotes are for fire doors supplied and installed, excluding electronic locks. So when comparing with the official figure, check whether installation is included and whether a fire certificate comes with the door; do not compare the door price alone.

Typical items on a BHU quotation

Our quotations are broadly grouped as follows:

Some quotes also include furniture, kitchen cabinets and air conditioners. These are not required for certification, so two quotes can differ simply because they include different things.

The above is Holling’s field observation and quotation categories, not an official rule.

Finished unit toilet with a glass shower enclosure, toilet pan and basin
Holling BHU Certification One-Stop Service project: finished toilet

The Specified Professional’s certification fee is extra

The last step of BHU certification is certification by a Specified Professional (a registered architect, registered professional engineer or registered professional surveyor). Pages 17 and 39 of the Housing Bureau presentation state that the showflat estimates exclude this fee, which starts at $3,500 per subdivided unit.

Besides the certification fee, depending on the unit, there may also be:

These vary from unit to unit. Fees for certification and signing have no standard rate and are set by each professional; what we have seen is generally higher than the official starting figure of $3,500. So when comparing quotes, first ask whether the certification and document fees are included.

We cover the application process, timeline and fees in a separate article.

Seven questions to ask before accepting a quote

  1. What material are the partition walls? Is there a fire certificate (for example a fire-rated brick or fire-rated gypsum board system)?
  2. What is the walls’ fire resistance period? Does it meet the requirement for your unit’s scenario (at least 1 hour of fire resistance plus smoke resistance)?
  3. Are the entrance and unit doors fire doors? Do they have smoke seals and self-closing function, and a certificate?
  4. Is the wiring and piping being redone or reused? Are the separate meters and distribution boards included?
  5. How many layers of toilet waterproofing? Is there a water test, and are the trap and anti-siphon device included?
  6. Are the Specified Professional’s certification and document fees in the quote? Which documents?
  7. Does the quote include furniture, air conditioners and appliances? Which are required for certification and which are optional?

Frequently asked questions

The government says a BHU conversion costs only about HK$50,000. Is that true?

The Housing Bureau’s showflat estimates average about $25,000 to $51,000 per subdivided unit (about $25,000 for showflat A and about $51,000 for showflat B). They are estimates for two units whose existing walls already complied. Units in worse condition will cost more.

Why do quotes from different renovation companies vary so much?

There are three common reasons: the existing walls, utilities and toilet differ from unit to unit; a quote may or may not include certification and document fees; and a quote may include non-essential items such as furniture and air conditioners. Compare quotes item by item, not just by total.

Does the official estimate include the Specified Professional’s certification fee?

No. Pages 17 and 39 of the Housing Bureau presentation state that the estimates exclude the certification fee, which starts at $3,500 per subdivided unit.

Do the partition walls always have to be replaced?

It depends on whether the existing walls meet the requirement for your unit’s scenario. The official showflats’ walls already complied, so none were replaced. In the units we have assessed, the partition walls have almost always needed replacing.

How long does a BHU conversion take?

The Housing Bureau estimates about 3 weeks for showflat A and about 4 weeks for showflat B (presentation pp.10 and 27). Actual time depends on the condition of your unit.

What work does a conversion involve? Case studies

To see what a conversion typically includes, these completed cases list each unit’s original problems and the changes made:

See all BHU conversion cases →

Next steps

Mind the deadline: existing SDUs must be registered on or before 28 February 2027 to get the grace period. See What SDU Owners Must Do Before 1 March 2027.

To get a sense of what your unit needs, first check it yourself against our article The Eight Minimum Standards for Basic Housing Units. To have us measure and inspect your unit, WhatsApp 6934 8391 with the unit address, floor area and number of subdivided units.

This article is for general reference only. It is not a quotation or professional certification advice. Actual costs depend on the unit’s condition on site, and whether it meets the standards is decided by the Specified Professional’s certification and the Housing Bureau.

Sources and last updated

Last updated: 17 November 2026. Policy may change; please refer to the latest Housing Bureau information.

The “typical items on a BHU quotation” and our comments on walls and certification documents are field observations by Holling BHU Certification One-Stop Service, not official rules.

Holling BHU Certification One-Stop Service | C2, 7/F, Por Mee Factory Building, 500 Castle Peak Road, Cheung Sha Wan, Kowloon (near Lai Chi Kok MTR Station) | Tel/WhatsApp 6934 8391


WhatsApp us · 6934 8391