This Holling project is in Quarry Bay, Hong Kong Island: a bare unit with exposed pipes in a 20-plus-storey building completed in the 1960s, converted into a Basic Housing Unit with an independent toilet, a sink outside the toilet and a kitchen. The work is complete.

Project summary

What problems did these units have?

The walls were peeling and pipes were exposed, down to bare concrete. To qualify as a BHU, the unit needed an enclosed independent toilet, a water point and sink outside the toilet, and room for a bed, kitchen and washing machine in a small area.

Similar unit? WhatsApp us for an initial assessment

What was changed in each unit?

Unit A: bare unit with exposed pipes turned into a bedroom with kitchen

Subdivided unit before and after renovation
Top: before; bottom: after
BHU bed and kitchen
Bed and kitchen
BHU independent toilet
Independent toilet

The walls were peeling with exposed pipes, down to bare concrete. Now the walls are replastered and painted, the bed is a platform with drawers, and next to it is a kitchen worktop with washing machine and fridge spaces, plus pegboard and overhead cabinets. The enclosed toilet has a glass shower screen and WC.

How does the work meet the government’s eight minimum standards?

StandardWhat we did
No. 5: Independent toiletThe unit has an enclosed independent toilet
No. 6: Water point and sink outside the toiletThe unit has a kitchen sink outside the toilet
No. 7: Lighting and ventilationThe unit has an openable window and lighting

For the other standards (floor area, headroom, fire safety, structure, separate water and electricity meters), see our guide to the eight minimum standards.

FAQ

How long does it take to convert a bare unit into a BHU?

Similar projects usually take 60–90 working days, depending on the number of units and the extent of the work. We can give a more accurate timeline after a site visit.

Can older flats on Hong Kong Island be converted into BHU?

Yes. The eight minimum standards apply across Hong Kong, not only Kowloon or the New Territories. Suitability depends mainly on floor area, headroom, fire safety, structure and separate water and electricity meters.

How is the cost calculated?

Cost depends on the number of units and the extent of the work. See our article on BHU conversion costs for why actual quotes can differ from the government estimate.

Related BHU conversion cases

See all BHU conversion cases →

Want to know if your unit can become a Basic Housing Unit? Send us the district, size and number of partitions, and we will give you an initial assessment.

WhatsApp us: 6934 8391

Note: Photos are real completed-work photos with brightness adjusted. To protect the owner’s privacy, building names and unit addresses are not shown. Holling is a Registered Minor Works Contractor (MWC 227/2023).

WhatsApp us · 6934 8391