Mong Kok Single-block Building: 2 Bare Units Converted into Basic Housing Units
By Holling BHU One-stop Certification | Last updated: 19 November 2026
This Holling project is in Mong Kok, Kowloon (near Prince Edward): two subdivided units in a single-block building with lifts, completed in the 1950s, rebuilt from bare concrete into Basic Housing Units. The work is complete.
Project summary
- Location: Mong Kok, Kowloon (near Prince Edward); single-block building with lifts
- Units: 2
- Scope: new partitions from bare concrete, independent toilets with water heaters, patterned-tile kitchens and washing machine spaces outside the toilet, storage platform beds, full-height wardrobes, lighting and air-conditioning
- Government minimum standards addressed: No. 5 independent toilet, No. 6 water point and sink outside the toilet, No. 7 lighting and ventilation
- Duration: similar projects usually take 60–90 working days, depending on the scope
- Status: completed
What problems did these units have?
Both units were stripped back to bare concrete, so each had to be planned from scratch: an enclosed independent toilet, a sink outside the toilet, and room for a bed, wardrobe, kitchen and washing machine in a small area. The building is old, so pipes and drainage also had to be rechecked.
Similar unit? WhatsApp us for an initial assessment
What was changed in each unit?
Unit A: storage platform bed, full-height wardrobe, green-tiled toilet



During the works the walls and floor were stripped to bare concrete. Now the bed is a storage platform beside a full-height wardrobe and fridge space, a patterned-tile kitchen with washing machine space is by the entrance, and the enclosed toilet has green tiles and a glass shower screen.
More photos


Unit B: bare unit turned into a window-side bedroom with patterned-tile kitchen



Only bare concrete walls remained, with a window air-conditioner. Now the bed is by the window with the air-conditioner kept, plus a full-height wardrobe; the patterned-tile kitchen has a sink, induction hob and washing machine space; and the toilet has a water heater, WC and basin.
More photos


How does the work meet the government’s eight minimum standards?
| Standard | What we did |
|---|---|
| No. 5: Independent toilet | Both units have an enclosed independent toilet |
| No. 6: Water point and sink outside the toilet | Both units have a kitchen sink outside the toilet |
| No. 7: Lighting and ventilation | The bed in Unit B is beside an openable window; both units have lighting and air-conditioning |
For the other standards (floor area, headroom, fire safety, structure, separate water and electricity meters), see our guide to the eight minimum standards.
FAQ
How long does it take to convert a bare unit in an older building into a BHU?
Similar projects usually take 60–90 working days, depending on the number of units and the extent of the work. We can give a more accurate timeline after a site visit.
Why check the drainage first in a bare unit?
Both the toilet and the kitchen sink need drainage. The position and fall of old drain pipes decide where the toilet and kitchen can go. Checking first helps avoid leaks or blockages later.
How is the cost calculated?
Cost depends on the number of units and the extent of the work. See our article on BHU conversion costs for why actual quotes can differ from the government estimate.
Related BHU conversion cases
- Prince Edward BHU Case: 3 Subdivided Units Converted
- Prince Edward Tong Lau BHU Case: 3 Units
- Wan Chai BHU Case: 3 Subdivided Units Converted
See all BHU conversion cases →
Want to know if your unit can become a Basic Housing Unit? Send us the district, size and number of partitions, and we will give you an initial assessment.
Note: Photos are real completed-work photos with brightness adjusted. To protect the owner’s privacy, building names and unit addresses are not shown. Holling is a Registered Minor Works Contractor (MWC 227/2023).