This Holling project is in Wan Chai, Hong Kong Island: three old subdivided units in a single-block high-rise building with a lift. We renovated the toilets, rebuilt the kitchens and separated the living area, bedroom and toilet. The work is complete.

Project summary

What problems did these units have?

All three were old subdivided units. The toilets had old tiles, exposed pipes and no shower separation. Cooking, the fridge and laundry drying were squeezed into one corner with nowhere to store things. To qualify as a BHU, each unit needs an enclosed independent toilet, a water point and sink outside the toilet, and adequate lighting and ventilation.

Similar unit? WhatsApp us for an initial assessment

What was changed in each unit?

Unit A: toilet fully renovated, kitchen in a single line

Old toilet before and new toilet with glass shower screen after
Top: before; bottom: after
BHU kitchen with induction hob, range hood, sink and washing machine
Kitchen sink outside the toilet

Old tiles and exposed pipes were removed, waterproofing was redone, and a glass shower screen, mirror cabinet and vanity were added. The kitchen runs along one wall with the induction hob, range hood, sink and washing machine, plus air-conditioning.

More photos

BHU toilet glass shower screen and mirror cabinetBHU platform bed next to the kitchen

Unit B: separate living room, bedroom and toilet

Old subdivided kitchen before and living room with kitchen after
Top: before; bottom: after
BHU bedroom by the window next to the independent toilet
Bedroom with window, toilet beside it
BHU independent toilet with window, shower and basin
Toilet with a window

Cooking and laundry used to share one spot. Now the entrance opens to a living room with kitchen, the bedroom is by the window with drawers under the bed, and the toilet has a window, a shower and a wall-hung basin.

More photos

BHU living room towards the kitchen and washing machineBHU living room towards the bedroom

Unit C: room for a dining table, kitchen and bedroom

Cluttered subdivided unit before and dining area with kitchen after
Top: before; bottom: after
BHU bedroom with window and air-conditioning
Air-con by the bedroom window

The fridge, cabinet and fan used to sit together. Now the kitchen has an induction hob and range hood, there is space for a dining table, and the bedroom is by the window with air-conditioning.

More photos

BHU dining table and kitchenBHU kitchen sink and washing machineBHU independent toilet shower

How does the work meet the government’s eight minimum standards?

StandardWhat we did
No. 5: Independent toiletAll three units have an enclosed independent toilet with a glass shower screen
No. 6: Water point and sink outside the toiletEach unit has a kitchen sink outside the toilet
No. 7: Lighting and ventilationBedrooms keep openable windows; some toilets also have windows

For the other standards (floor area, headroom, fire safety, structure, separate water and electricity meters), see our guide to the eight minimum standards.

FAQ

How long does it take to convert a subdivided unit in an older building into a BHU?

Similar projects usually take 60–90 working days, depending on the number of units and the extent of the work. We can give a more accurate timeline after a site visit.

What fire safety points matter when converting units in a single-block building?

Standard No. 3 (fire safety) requires access to at least two escape staircases (except in single-staircase buildings), and fire-resisting wall and door requirements depend on the building’s existing entrance fire door. We inspect the site before designing.

How is the cost calculated?

Cost depends on the number of units and the extent of the work. See our article on BHU conversion costs for why actual quotes can differ from the government estimate.

Related BHU conversion cases

See all BHU conversion cases →

Want to know if your unit can become a Basic Housing Unit? Send us the district, size and number of partitions, and we will give you an initial assessment.

WhatsApp us: 6934 8391

Note: Photos are real completed-work photos with brightness adjusted. To protect the owner’s privacy, building names and unit addresses are not shown. Holling is a Registered Minor Works Contractor (MWC 227/2023).