Tsim Sha Tsui Composite Building: Bare Unit Converted into a Basic Housing Unit

By Holling BHU One-stop Certification | Last updated: 19 November 2026

This Holling project is in Tsim Sha Tsui, Kowloon: a bare unit with peeling walls in an older composite building completed in the 1950s, converted into a Basic Housing Unit with an independent toilet, a sink outside the toilet and a kitchen. The work is complete.

Project summary

What problems did these units have?

The walls were peeling back to bare concrete and there was no usable kitchen or toilet. To qualify as a BHU, the unit needed an enclosed independent toilet, a water point and sink outside the toilet, and adequate lighting and ventilation.

Similar unit? WhatsApp us for an initial assessment

What was changed in each unit?

Unit A: peeling bare unit turned into a window-side bedroom, toilet with a window

Subdivided unit before and after renovation
Top: before; bottom: after
BHU kitchen
Kitchen
BHU independent toilet with window
Independent toilet with window

The walls were peeling back to bare concrete, with an air-conditioner opening by the window. Now the walls are replastered and painted with wood-look flooring, a storage platform bed sits by the window, the kitchen has a sink and fridge space, and the toilet has a window, glass shower screen and WC.

More photos

BHU entrance view into the unit

How does the work meet the government’s eight minimum standards?

StandardWhat we did
No. 5: Independent toiletThe unit has an enclosed independent toilet
No. 6: Water point and sink outside the toiletThe unit has a kitchen sink outside the toilet
No. 7: Lighting and ventilationThe bed is beside an openable window, and the toilet also has a window

For the other standards (floor area, headroom, fire safety, structure, separate water and electricity meters), see our guide to the eight minimum standards.

FAQ

How long does it take to convert a bare unit into a BHU?

Similar projects usually take 60–90 working days, depending on the number of units and the extent of the work. We can give a more accurate timeline after a site visit.

Why does a toilet window help a BHU?

Standard No. 7 covers lighting and ventilation. An openable toilet window lets moisture escape naturally and reduces mould; toilets without a window usually need an exhaust fan.

How is the cost calculated?

Cost depends on the number of units and the extent of the work. See our article on BHU conversion costs for why actual quotes can differ from the government estimate.

Related BHU conversion cases

See all BHU conversion cases →

Want to know if your unit can become a Basic Housing Unit? Send us the district, size and number of partitions, and we will give you an initial assessment.

WhatsApp us: 6934 8391

Note: Photos are real completed-work photos with brightness adjusted. To protect the owner’s privacy, building names and unit addresses are not shown. Holling is a Registered Minor Works Contractor (MWC 227/2023).

WhatsApp us · 6934 8391