Jordan (Ferry Point) Older Building: 6 Subdivided Units Converted into Basic Housing Units
By Holling BHU One-stop Certification | Last updated: 19 November 2026
This Holling project is in the Ferry Point area of Jordan, Kowloon: six old subdivided units (the smallest about 110 sq ft) in an older private estate building with a lift, all converted into Basic Housing Units with independent toilets, sinks outside the toilet and patterned-tile kitchens. The work is complete.
Project summary
- Location: Jordan, Kowloon (Ferry Point area); older private estate building with a lift
- Units: 6 (Unit A about 110 sq ft)
- Scope: removal of old partitions and finishes, independent toilets with water heaters, patterned-tile kitchens and washing machine spaces outside the toilet, platform beds with storage, lighting and window air-conditioners
- Government minimum standards addressed: No. 5 independent toilet, No. 6 water point and sink outside the toilet, No. 7 lighting and ventilation
- Duration: similar projects usually take 60–90 working days, depending on the scope
- Status: completed
What problems did these units have?
All six were old subdivided units: one had a bunk bed, one had kitchen clutter piled by the window, and one was stripped to bare concrete. The units are small, the smallest about 110 sq ft, so the toilet, sink, kitchen, bed and storage all had to fit while keeping enough light and ventilation.
Similar unit? WhatsApp us for an initial assessment
What was changed in each unit?
Unit A: about 110 sq ft, rebuilt from bare concrete



About 110 sq ft, rebuilt from bare concrete. A patterned-tile kitchen with sink, range hood and washing machine runs along the entrance corridor; the bed is a platform with storage next to a window air-conditioner; the toilet has a water heater, WC and glass shower screen.
More photos




Unit B: bunk-bed room turned into separate kitchen and bed



Originally an old subdivided room with a bunk bed. Now one side has a patterned-tile kitchen and the other a platform bed with fridge space; the toilet has a water heater and glass shower screen.
More photos



Unit C: kitchen and dining table by the window



The window area used to be piled with kitchen clutter. Now there is a kitchen and small dining table by the window, a platform bed, and an independent toilet beside it.
More photos




Unit D: bed by the window, toilet with a window



The platform bed is by the window, the patterned-tile kitchen has a washing machine space, and the toilet has a window, WC and basin.
More photos




Unit E: kitchen at the entrance, platform bed by the window



The kitchen is at the entrance, the platform bed with overhead cabinets is by the window, and the toilet has a water heater, WC and shower.
More photos


Unit F: old kitchen turned into a patterned-tile kitchen



Originally an old kitchen full of clutter. Now there is a patterned-tile kitchen with induction hob and washing machine space, a bed by the window, and a toilet with a water heater and shower.
More photos




How does the work meet the government’s eight minimum standards?
| Standard | What we did |
|---|---|
| No. 5: Independent toilet | All six units have an enclosed independent toilet with a glass shower screen |
| No. 6: Water point and sink outside the toilet | Each unit has a kitchen sink outside the toilet |
| No. 7: Lighting and ventilation | Beds and kitchens are beside openable windows; some toilets also have windows |
For the other standards (floor area, headroom, fire safety, structure, separate water and electricity meters), see our guide to the eight minimum standards.
FAQ
How long does it take to convert a small subdivided unit into a BHU?
Similar projects usually take 60–90 working days, depending on the number of units and the extent of the work. We can give a more accurate timeline after a site visit.
Can a unit of about 110 sq ft apply to be a BHU?
It may. Standard No. 1 requires an internal floor area of at least 8 m² (about 86 sq ft), and the other seven standards must also be met. Actual area depends on site measurement, so a site assessment comes first.
How is the cost calculated?
Cost depends on the number of units and the extent of the work. See our article on BHU conversion costs for why actual quotes can differ from the government estimate.
Related BHU conversion cases
- Jordan BHU Case: 4 Units Rebuilt from Bare Concrete
- Jordan Composite Building BHU Case
- Tsim Sha Tsui BHU Case: Bare Unit Rebuilt
See all BHU conversion cases →
Want to know if your unit can become a Basic Housing Unit? Send us the district, size and number of partitions, and we will give you an initial assessment.
Note: Photos are real completed-work photos with brightness adjusted. To protect the owner’s privacy, building names and unit addresses are not shown. Holling is a Registered Minor Works Contractor (MWC 227/2023).