Grace-period registration for subdivided units closes on 28 February 2027 — free to register | WhatsApp 6934 8391

Jordan Composite Building: Old Subdivided Unit Converted into a Basic Housing Unit

By Holling BHU One-stop Certification | Last updated: 19 November 2026

This Holling project is in Jordan, Kowloon: an old subdivided unit in a composite (commercial-residential) building completed in the 1960s, converted into a Basic Housing Unit with an enclosed independent toilet, a sink outside the toilet and a kitchen. The work is complete.

Project summary

What problems did these units have?

The unit was an old subdivided room. The kitchen counter was crowded with a stove, fridge and clutter, the toilet fittings were worn, and there was little storage. In a composite building, fire services and escape routes in the common parts also need checking.

Similar unit? WhatsApp us for an initial assessment

What was changed in each unit?

Unit A: cluttered kitchen rebuilt, toilet renovated

Subdivided unit before and after renovation
Top: before; bottom: after
BHU kitchen and washing machine space
Kitchen and washing machine space
BHU kitchen next to the independent toilet
Kitchen next to the independent toilet

The old kitchen counter was crowded with cooking items, a stove, fridge and clutter, and the toilet fittings were worn. Now there are new kitchen cabinets with a sink, induction hob, microwave space and washing machine space; the toilet is renovated with a glass shower screen; and the bed is a storage platform with a wardrobe and air-conditioner.

More photos

BHU entrance view into the kitchenBHU platform bed and wardrobe

How does the work meet the government’s eight minimum standards?

StandardWhat we did
No. 5: Independent toiletThe unit has an enclosed independent toilet
No. 6: Water point and sink outside the toiletThe unit has a kitchen sink outside the toilet
No. 7: Lighting and ventilationNew lighting and air-conditioning

For the other standards (floor area, headroom, fire safety, structure, separate water and electricity meters), see our guide to the eight minimum standards.

FAQ

How long does it take to convert a subdivided unit in a composite building into a BHU?

Similar projects usually take 60–90 working days, depending on the number of units and the extent of the work. We can give a more accurate timeline after a site visit.

Can a subdivided unit in a composite building become a BHU?

It may, depending on the building’s permitted use, fire services and escape routes. We check the building records and inspect on site before advising whether to apply.

How is the cost calculated?

Cost depends on the number of units and the extent of the work. See our article on BHU conversion costs for why actual quotes can differ from the government estimate.

Related BHU conversion cases

See all BHU conversion cases →

Want to know if your unit can become a Basic Housing Unit? Send us the district, size and number of partitions, and we will give you an initial assessment.

WhatsApp us: 6934 8391

Note: Photos are real completed-work photos with brightness adjusted. To protect the owner’s privacy, building names and unit addresses are not shown. Holling is a Registered Minor Works Contractor (MWC 227/2023).

WhatsApp us · 6934 8391