Grace-period registration for subdivided units closes on 28 February 2027 — free to register | WhatsApp 6934 8391

How to Apply for Separate Water and Electricity Meters for BHUs: OC Consent, Forms and Timing

By Holling One-Stop BHU Certification | Last updated: 23 November 2026

Short answer

Separate meters are one of the eight BHU minimum standards.

How do water and electricity meter applications differ?

ItemSeparate water meterSeparate electricity meter
Meter provided byWater Supplies DepartmentPower company (CLP or HK Electric)
Who to hireLicensed plumberRegistered electrical contractor
DocumentsWSD application form (if installed inside an SDU, reasons must be given on WWO 1156A and approved)Power company’s dedicated SDU application form; Work Completion Certificate (Form WR1)
LocationThe host flat’s common area or inside the SDU; or the building’s common partsUsually the building’s common parts (e.g. meter room, common corridor); may be in the host flat’s common area if the power company’s requirements are met
When consent is neededIf installed in the building’s common parts, OC or other owners’ consent may be needed under the DMCIf installed in the building’s common parts, or the approved loading is increased, prior written consent from the relevant owners or OC
Government guidanceGovernment Code of Practice (water meter section); application details per the latest WSD guidanceEMSD Guidelines on installation of individual electricity meters for SDUs under the BHU regime

How to apply for a separate water meter

  1. Hire a licensed plumber: applications and installation must be carried out by a licensed plumber.
  2. Decide the meter location: separate water meters and pipes may be installed in the host flat’s common area or inside the SDU, generally without DMC consent. If installed inside the SDU, reasons must be given on Form WWO 1156A and approved by the WSD.
  3. If installing in the building’s common parts: the consent of the owners’ corporation or other owners may be required under the DMC.
  4. Submit and install: the licensed plumber submits the application to the WSD and carries out the works once approved; forms and processing time follow the latest WSD guidance.

How to apply for a separate electricity meter

  1. Hire a registered electrical contractor: under the Electricity Ordinance, electrical work for separate meters must be carried out by a registered electrical contractor, who designs new circuits based on the host flat’s approved loading and number of SDUs, and helps prepare and submit the application.
  2. Apply through the power company’s dedicated process: CLP and HK Electric both have dedicated application processes and web pages for SDU meters. One application generally covers all SDUs and the common area in the host flat.
  3. Obtain the necessary consent: if meters will be in the building’s common parts, or the approved loading needs to increase, obtain prior written consent from the owner of the common parts or the building’s communal electrical installations (for example the rising mains), such as the owners’ corporation, and submit it to the power company.
  4. Works and WR1: on completion, the registered electrical contractor issues a Work Completion Certificate (WR1); the power company then inspects, connects and installs the meters.
  5. Arrange power interruptions: works may involve intermittent power cuts, so notify residents in advance.

If meters are installed in the flat’s internal corridor, fire safety requirements still apply — for example a clear corridor headroom of at least 2 m and a clear width of at least 0.75 m or 1.05 m depending on the case. CLP also requires sufficient 4G signal at the meter position for smart meters. See BHU Fire Safety Requirements.

Do you need owners’ corporation consent?

Meter locationWater meterElectricity meter
Inside the SDUGenerally no DMC consent; reasons must be given to and approved by the WSD—
Host flat’s common area (e.g. internal corridor)Generally no DMC consentGenerally no OC or other owners’ consent; must meet the power company’s requirements
Building’s common parts (e.g. meter room, common corridor)OC or other owners’ consent may be needed under the DMCPrior written consent required
Approved loading needs to increase—Prior written consent from the owner of the building’s communal electrical installations required

For buildings without an owners’ corporation, CLP has a separate application guide for “three-nil” buildings, and applicants must submit supporting documents as set out in the guide. For a wider look at consent for conversion works, see Converting SDUs to BHUs: Do You Need Owners’ Corporation Consent?

How much time should you allow?

EMSD guidance states that electrical work for separate meters takes about 1 working day per SDU, plus 1 working day to consolidate the SDU circuits and test, excluding application and approval time. If OC consent or a loading increase is needed, it will take longer. Because BHU recognition requires the separate meters to be installed, start applying early in the conversion works to avoid delaying certification. See How to Apply for BHU Recognition.

FAQ

Can the landlord install sub-meters and charge tenants?

That does not meet the BHU standard. The law requires separate meters provided for each SDU by the Water Supplies Department and the power company, not sub-meters installed by the landlord.

Must separate electricity meters be in the building’s meter room?

They are usually in the building’s common parts, but may be installed in the host flat’s common area (such as its internal corridor) if the power company’s requirements are met; in that case OC consent is generally not needed.

What is a WR1?

A WR1 is the Work Completion Certificate issued by a registered electrical contractor after inspecting and testing a fixed electrical installation. The power company needs a valid WR1 before connecting and installing separate meters.

Can common-area lighting have its own meter?

Yes. According to CLP guidance, facilities in the host flat’s common area (such as lighting) may also have a separate meter if they need an independent supply.

Sources

This article is general information only. Actual requirements are subject to the latest guidance from the WSD, EMSD, power companies and the Government.

WhatsApp us · 6934 8391