Quick answer: what should you check first?

Use the seven questions below as one checklist for every provider, so you can compare them like for like.

“Certification company”, contractor or specified professional: what is the difference?

“BHU certification company” is not a legal term. Under the government’s BHU regime, the owner (or a person with the owner’s written consent) applies for recognition on Form BHU-01, together with a certification report signed by a specified professional. Companies marketed as “certification companies” usually coordinate the assessment, conversion works and paperwork, with an in-house or partner specified professional signing the report.

RoleWhat they doWhat to check
Specified professionalInspects the unit and signs the certification report under the Code of PracticeWhether they belong to a professional category and discipline listed by the government
ContractorCarries out works such as partition walls, fire doors, toilets, water and electricityFor minor works, whether the company is a Registered Minor Works Contractor with the Buildings Department
Coordinator (the “certification company”)Arranges the assessment, works, certification and applicationWho fills the two roles above, and whether the scope is written into the contract

One company can fill several roles, or you can hire them separately. What matters is that every role is clearly assigned and the scope and responsibilities are written into the contract.

Which professionals can sign the certification report?

The government lists three types of specified professionals who can sign the certification report:

Engineers must belong to one of the disciplines above. Once signed by the specified professional, the certification report is submitted to the government together with the application.

Seven questions to ask before you sign

1. What will the assessment cover, and what will you receive?

Ask what the assessment will inspect and whether you will receive a written list of required works. A good list goes unit by unit: current condition, items that do not yet meet the standards (for example fire-resisting partitions, entrance doors, toilets, ventilation, separate water and electricity meters) and the proposed fix. With the same scope of works, quotes from different providers become comparable.

2. What type of professional will certify the unit?

Ask which category of specified professional will carry out the certification, such as a registered architect, registered professional engineer or registered professional surveyor, and confirm they fall within the disciplines listed by the government. You can also ask whether the works will be checked against the standards during construction, so problems are not found only after completion.

3. What does the quote include?

Ask for separate items for the site visit, design, works, follow-up inspection, certification report, application paperwork and responses to further requests. For each item, confirm which units are covered, what is delivered, when payment is due and what is charged separately, such as applications for separate water or electricity meters, the fire service installation certificate (FS251) and the electrical work completion certificate (WR1). The government’s recognition application fee is separate from a company’s service fee, so compare them separately.

4. How are additional works approved?

In older flats, removing finishes sometimes reveals pipes or wiring that need replacing. Put in the contract who proposes a change, how the cost and schedule impact are quoted, and that your written approval is required before the extra work starts.

5. If the unit does not pass certification, how are remedial works and follow-up visits handled?

Confirm who arranges follow-up inspections, how many visits the quote includes and whether a return visit after remedial works costs extra. If the provider offers a guarantee such as “recognition completed”, write the details into the contract: who carries out remedial works and who pays if the unit does not pass. Treat omissions in the original works separately from new works the owner adds.

6. Who handles the application and requests for further documents?

The certification report must be issued within 14 calendar days after the last site inspection, and the application submitted within 28 calendar days from the report’s date of issue. Confirm who prepares the report and documents, who reminds the applicant to sign, and who responds if the government asks for more information, so the report does not expire and need redoing. See How to Apply for BHU Recognition: 5 Steps & Documents.

7. Can you see a comparable conversion project?

Tong laus, single-block older buildings and composite buildings each have different constraints. Ask for a project in a similar building, with before-and-after photos explaining what changed: how the layout was adjusted, where the toilet and sink were placed, and how fire doors were handled. For example, Holling’s Mong Kok single-block building project converted two bare units into BHUs, each with a separate toilet, and the Sham Shui Po tong lau project rebuilt the toilets and kitchens of four units from bare shell. See all BHU conversion projects.

One-stop service, or works and certification separately?

One-stop (one company coordinates)Separate providers
AdvantagesOne point of contact; assessment, works and certification follow the same standard, so less reworkYou can compare works and certification prices separately; the certifier is independent of the contractor
Watch out forWhich category of specified professional will certify; scope and responsibilities written into the contractCertification after the works may reveal failures that need rework; you coordinate both parties yourself
Better suited toSeveral units, larger conversions, owners with little timeUnits needing only minor changes, or owners familiar with building works

What to prepare before asking for a quote

To see what Holling’s assessment covers, read Holling’s BHU services, or WhatsApp 6934 8391.

Frequently asked questions

Do I have to use a “certification company” for BHU recognition?

No. The law requires a certification report signed by a specified professional, and the application is made by the owner or a person with the owner’s written consent. You can engage a specified professional and a contractor yourself, or use one company to coordinate.

Who can sign a BHU certification report?

A registered architect, a registered professional engineer (building, civil, structural, fire or building services discipline) or a registered professional surveyor (building surveying division).

How can I check whether a contractor is qualified for BHU works?

Where the conversion involves minor works (such as new partition walls or toilet drainage), check the Buildings Department’s register of Registered Minor Works Contractors for the company’s name and registration number.

Should a quote include the government’s recognition application fee?

The government’s recognition application fee (HK$3,000 per subdivided unit, with reductions or waivers in the first three years) is collected by the government and is separate from a company’s service fee. When comparing quotes, ask whether it is included, paid on your behalf or paid by you directly.

Does a certification report expire?

Yes, in effect. The report must be issued within 14 calendar days after the last site inspection, and the application submitted within 28 calendar days from the report’s date of issue; otherwise a new certification may be needed.